• <li id="ee8ee"></li>
    <li id="ee8ee"><tt id="ee8ee"></tt></li>
  • <li id="ee8ee"></li>
  • <li id="ee8ee"><table id="ee8ee"></table></li>
    <tt id="ee8ee"><table id="ee8ee"></table></tt>
  • <li id="ee8ee"><tt id="ee8ee"></tt></li>
    <li id="ee8ee"></li>
  • <tt id="ee8ee"></tt>
    Home>>

    "Spider men" work for power transmission project in Chongqing (7)

    (Xinhua) 09:11, December 06, 2021

    Photo taken on Dec. 5, 2021 shows utility technicians working at the construction site of the Chongqing section of the "Baihetan-Jiangsu" ultra-high-voltage (UHV) power transmission project over the Yangtze River in southwest China's Chongqing Municipality. At a height of about 100 meters over the Yangtze River, a team of utility technicians worked six hours incessantly every day like "spider men", regardless of the winter coldness. The work of the "spider men" is part of the "Baihetan-Jiangsu" ultra-high-voltage (UHV) power transmission project. The 800-kilovolt, direct-current transmission project is celebrated as one of China's "power highways" and is an important part of the country's west-to-east power transmission program. (Xinhua/Huang Wei)


    【1】【2】【3】【4】【5】【6】【7】【8】【9】

    (Web editor: Peng Yukai, Liang Jun)

    Photos

    Related Stories

    手机在线观看日韩av